Conspector was appointed to deliver FF&E mid-cycle refresh works to a suite of newly finished hotel bathrooms, upgrading wall-mounted fixtures across wash hand basin and shower areas to keep the rooms presenting to brand standard. The brief called for new fixtures to be installed cleanly and securely within finished, guest-facing spaces, without disturbing the surrounding high-specification finishes.
Working to that standard, Conspector replaced the existing fixtures with new wall-mounted units fixed securely through porcelain tiling. The result is a clean, consistent and hard-wearing fixture finish across every bathroom, with the existing porcelain and modern presentation fully protected throughout and each room returned guest-ready. The works demonstrate Conspector’s ability to carry out precise refresh works within finished, high-specification environments where protecting the existing finish is as important as the upgrade itself.
What We Delivered
- FF&E mid-cycle refresh delivered across a suite of finished guest bathrooms
- Wall-mounted fixtures upgraded to brand standard at basin and shower areas
- Existing porcelain and high-spec finishes protected throughout
- Every bathroom returned clean, consistent and guest-ready
Services Used


Josh at Conspector has been helping us with some onerous and challenging defects at our properties. His attention to detail and “can-do” attitude has been very welcome.
Documentation to support the works including CAD drawings, scheduling and photographic records are all part of his professional service.
We will undoubtedly continue to work with Josh, and he comes highly recommended.
First Name Last Name
Head of Property and Development,
The Sirius Hotel Group






