Bathroom Renovations Four Points Flex by Sheraton

Conspector was appointed to refurbish multiple existing hotel wet-room bathrooms following deterioration to the existing floor and shower areas. The works involved the careful strip-out of sanitaryware, grab rails, existing vinyl flooring, former shower trays, rotten ply boarding and saturated insulation/fill.

The bathrooms were then rebuilt and upgraded, including replacement of rotten floor boarding with marine ply, alterations to shower and wash hand basin services, additional lighting, fire-rated works to ceilings and corridor walls, and installation of moisture-resistant ceiling framing. New wet-wall panels were installed to all four walls, with darker feature panels to the shower areas, followed by new low-level anti-slip shower trays, shower screens, vinyl flooring and silicone sealing throughout.

Existing sanitaryware, handrails, grab rails, fixtures and fittings were reinstated, with new shelving and access hatches installed to support future maintenance. The works were planned and coordinated within a live hotel environment, with attention given to layout, accessibility, durability and ease of ongoing maintenance.

What We Delivered

  • Full bathroom strip-out and preparation across multiple guest rooms
  • Waterproofing, wet wall and sanitaryware installation to brand standard
  • Plumbing, ventilation and electrical works coordinated across trades
  • Programme managed within a live hotel environment to minimise disruption to guests and operations
  • Rooms handed back clean, complete and ready for guest occupation

Services Used

bathroom renovated by conspector in four points flex edinburgh hotel
shower four points flex edinburgh
left quote mark
right quote mark
renovated bathroom in sheraton four points flex hotel edinburgh
sink four points flex hotel bathroom
bathroom renovation four points flex edinburgh